Works in progress

Show works by date range:

From:  
To:  
Suburb Type of work Start date
(anticipated)
End date
(anticipated)
Details
Cairns region Sewerage Works 12/09/2018 01/07/2019 Annual Sewer relining program Annual sewer relining program to ensure structural integrity of the sewers. Read more
Holloways Beach Major Infrastructure Project 17/10/2018 30/06/2019 Holloways Beach foreshore improvement Works underway until June 2019 Read more
Trinity Beach Sewerage Works 01/01/2019 30/04/2019 Works to sewer pump station at Coastwatchers Park A new odour control unit is programmed to be installed at an existing sewer pump station (SPS TB1) located to the rear of Coastwatchers Park at Trinity Beach Road, Trinity Beach. Read more
Kewarra Beach Sewerage Works 01/01/2019 30/07/2019 New sewer pump station Kewarra Beach Existing sewer pump station to be demolished and a new sewer pump station (SPS KB1) is to be constructed. Read more
Cairns 01/01/2019 30/06/2019 Improvement works to wetwell and valve pit lids Upgrades to wetwell and valve pit lids in various locations across Cairns Read more
Babinda Sewerage Works 01/01/2019 30/06/2019 Works to sewer pump station in Babinda Upgrade works to sewer pump station located off Howard Kennedy Drive. Read more
Edmonton Sewerage Works 01/01/2019 30/06/2019 Improvement works to sewer pump station at Fuller Park Improvement works to existing sewer pump station located at Fuller Park, Edmonton. Read more
Cairns North Car Park Works 04/02/2019 30/04/2019 Charles St parking improvements CBD parking improvement works on Charles St, between Sheridan St and Lake St. Read more
Trinity Beach Footpath & Cycleway Works 04/03/2019 30/04/2019 Trinity Beach foreshore pathway upgrade Sections of the Trinity Beach foreshore pathways will be upgraded. Read more
Clifton Beach Footpath & Cycleway Works 07/01/2019 30/06/2019 Northern Beaches Leisure Trail - Clifton Beach North A new pathway will be constructed along the northern foreshore of Clifton Beach. Read more
Smithfield Parks & Playgrounds 15/02/2019 31/05/2019 Cattana Wetlands improvements Further improvements are planned for Cattana Wetlands. Read more
Cairns city Parks & Playgrounds 04/02/2019 31/05/2020 Smart Urban Irrigation Project Irrigation works planned for Cairns Esplanade. Read more
Redlynch Footpath & Cycleway Works 15/01/2019 30/06/2019 Redlynch recreation parklands - pathway works Pathway works near St Andrew's Catholic College Read more
Redlynch 01/03/2019 30/06/2019 Installation of Outdoor Warning Stations in the Redlynch Valley Installation of nine Outdoor Warning Stations across parts of Redlynch and Brinsmead Read more
Trinity Beach Minor Road Works 26/11/2018 30/06/2019 Roadworks - Trinity Beach Road Water main replacement and road pavement works Read more
Edge Hill Footpath & Cycleway Works 13/05/2019 14/06/2019 Footpath works - Cairns Botanic Gardens Footpath renewal in front of the Cairns Botanic Gardens Read more
Earlville Minor Road Works 04/04/2019 03/05/2019 Roadworks - Irene St, Earlville Pavement rehabilitation works Read more
Cairns city Lighting & Traffic Signals 17/03/2019 28/06/2019 Roadworks – Lake St & Abbott St (Aplin to Florence) New street lighting, centre median parking changes, u-turns and right-turn lanes. Read more
Gordonvale Parks & Playgrounds 11/03/2019 31/07/2019 Greenpatch improvement works Improvement works are underway at Greenpatch camping ground Read more
White Rock Minor Road Works 01/04/2019 19/04/2019 Roadworks - Kowinka Street Road pavement rehabilitation from Kimba Close to Links Dve Read more
Redlynch Minor Road Works 29/04/2019 30/06/2019 Roadworks - Redlynch Intake Rd Road safety improvements. Read more
Manunda Major Infrastructure Project 01/01/2019 30/05/2019 Council's new laboratory Construction of a new laboratory to improve testing services to the far northern community. Read more
Bungalow Drainage Works 01/04/2019 30/04/2019 Roadworks - Scott Street Drainage culvert replacement between Edgar St and Wellington St Read more
Kanimbla Drainage Works 01/05/2019 30/06/2020 Roadworks - Lake Morris Road Extensive roadworks program over 2019/2020 Read more
Cairns City Water Supply Works 01/01/2019 30/07/2019 Water main replacement in the CBD Water main replacement along sections of Aplin and Abbott Streets in the CBD Read more
Edge Hill Footpath & Cycleway Works 28/03/2019 30/06/2019 Centenary Lakes boardwalk replacement The Centenary Lakes boardwalk is being replaced. Read more
Edge Hill Parks & Playgrounds 23/04/2019 07/05/2019 Centenary Lakes Nature Playground maintenance Maintenance works Read more
Aeroglen Footpath & Cycleway Works 27/03/2019 01/01/2019 Jack Barnes mangrove boardwalk closure Boardwalk closed. Read more
Cairns North Minor Road Works 06/05/2019 24/05/2019 Intersection changes - McLeod St / Arthur St No right turn from McLeod St to Arthur St Read more
Cairns city 01/05/2019 30/06/2019 Demolition works - Hartley and Grafton streets Demolition of old Post Office building Read more
Kanimbla Minor Road Works 15/04/2019 10/05/2019 Roadworks - Ramsey Drive Asphalt overlay works Read more
Various Parks & Playgrounds 29/04/2019 24/05/2019 Public Toilet Refurbishment - Various locations Public toilet upgrades Read more
Portsmith Minor Road Works 23/04/2019 24/04/2019 Roadworks - Fearnley St Asphalt overlay works Read more
Earlville Footpath & Cycleway Works 15/04/2019 30/04/2019 Footpath works - Yarrum St, Earlville Footpath construction works Read more
Trinity Beach Minor Road Works 29/04/2019 30/06/2019 Roadworks - Trinity Beach Rd, Trinity Beach Pavement rehabilitation works Read more
Gordonvale Minor Road Works 29/04/2019 13/05/2019 Cannon St roadworks Road pavement works Read more
Edge Hill Drainage Works 23/04/2019 28/04/2019 Roadworks - Greenslopes St Culvert replacement works Read more