Calder St / Mazlin St roadworks

  • Suburb: Edge Hill
  • Work period (anticipated): 05/09/2019 to 20/09/2019
  • Description: Road closures required for drainage works
  • Likely impacts: Noise; Dust; Property Access; Traffic Control; Road Closure
  • Location: Calder St / Mazlin St intersection
  • Status: Open

Culvert replacement works are programmed for Mazlin St and Calder St from THURSDAY 5 SEPTEMBER 2019.

This work involves removal and replacement of two drainage culverts underneath the road at the following locations:
(1) between property no. 25 Mazlin St and 24 Mazlin St; and
(2) between property no. 25 Mazlin St and no. 27 Mazlin St.

Road closures will be required. Works will start in Mazlin St first and the road will be closed for an estimated 3 - 5 days. Calder St works will follow and this road closure will be required for approx. 5 days.

During this time, please observe and obey traffic controllers and follow detours as sign posted.

Thank you for your patience and cooperation. If you have any concerns or would like further information, please email feedback@cairns.qld.gov.au.

Last updated: 03 September 2019