Current Works in Progress

Suburb Type of work Start date
(anticipated)
End date
(anticipated)
Details
Cairns region Sewerage Works 12/09/2018 01/07/2019 Annual Sewer relining program Annual sewer relining program to ensure structural integrity of the sewers. Read more
Holloways Beach Major Infrastructure Project 17/10/2018 30/06/2019 Holloways Beach foreshore improvement Works underway until June 2019 Read more
Kewarra Beach Sewerage Works 01/01/2019 30/07/2019 New sewer pump station Kewarra Beach Existing sewer pump station to be demolished and a new sewer pump station (SPS KB1) is to be constructed. Read more
Cairns 01/01/2019 30/06/2019 Improvement works to wetwell and valve pit lids Upgrades to wetwell and valve pit lids in various locations across Cairns Read more
Babinda Sewerage Works 01/01/2019 30/06/2019 Works to sewer pump station in Babinda Upgrade works to sewer pump station located off Howard Kennedy Drive. Read more
Edmonton Sewerage Works 01/01/2019 30/06/2019 Improvement works to sewer pump station at Fuller Park Improvement works to existing sewer pump station located at Fuller Park, Edmonton. Read more
Cairns North Car Park Works 04/02/2019 07/06/2019 Car parking changes - Charles St CBD parking improvement works on Charles St, between Sheridan St and Lake St. Read more
Clifton Beach Footpath & Cycleway Works 07/01/2019 30/06/2019 Northern Beaches Leisure Trail - Clifton Beach North A new pathway will be constructed along the northern foreshore of Clifton Beach. Read more
Smithfield Parks & Playgrounds 15/02/2019 31/05/2019 Cattana Wetlands improvements Further improvements are planned for Cattana Wetlands. Read more
Cairns city Parks & Playgrounds 04/02/2019 31/05/2020 Smart Urban Irrigation Project Irrigation works planned for Cairns Esplanade. Read more
Redlynch Footpath & Cycleway Works 15/01/2019 30/06/2019 Redlynch recreation parklands - pathway works Pathway works near St Andrew's Catholic College Read more
Redlynch 01/03/2019 30/06/2019 Installation of Outdoor Warning Stations in the Redlynch Valley Installation of nine Outdoor Warning Stations across parts of Redlynch and Brinsmead Read more
Edge Hill Footpath & Cycleway Works 13/05/2019 14/06/2019 Footpath works - Cairns Botanic Gardens Footpath renewal in front of the Cairns Botanic Gardens Read more
Cairns city Lighting & Traffic Signals 17/03/2019 28/06/2019 Roadworks – Lake St & Abbott St (Aplin to Florence) New street lighting, centre median parking changes, u-turns and right-turn lanes. Read more
Gordonvale Parks & Playgrounds 11/03/2019 31/07/2019 Greenpatch improvement works Improvement works are underway at Greenpatch camping ground Read more
Edge Hill Minor Road Works 01/04/2019 31/05/2019 Roundabout works - Collins Ave/Pease St/Woodward St Roundabout asphalt and safety works. Read more
Redlynch Minor Road Works 29/04/2019 30/06/2019 Roadworks - Redlynch Intake Rd Road safety improvements. Read more
Manunda Major Infrastructure Project 01/01/2019 30/05/2019 Council's new laboratory Construction of a new laboratory to improve testing services to the far northern community. Read more
Kanimbla Drainage Works 01/05/2019 30/06/2020 Roadworks - Lake Morris Road Road closed from 1 May - extensive roadworks program over 2019/2020 Read more
Cairns City Water Supply Works 01/01/2019 30/07/2019 Water main replacement in the CBD Water main replacement along sections of Aplin and Abbott Streets in the CBD Read more
Edge Hill Footpath & Cycleway Works 28/03/2019 30/06/2019 Centenary Lakes boardwalk replacement The Centenary Lakes boardwalk is being replaced. Read more
Aeroglen Footpath & Cycleway Works 27/03/2019 01/01/2019 Jack Barnes mangrove boardwalk closure Boardwalk closed. Read more
Cairns North Minor Road Works 07/05/2019 24/05/2019 Intersection changes - McLeod St / Arthur St No right turn from McLeod St to Arthur St Read more
Cairns city 20/05/2019 30/06/2019 Demolition works - Hartley and Grafton streets Demolition of old Post Office building Read more
Kanimbla Minor Road Works 22/04/2019 31/05/2019 Roadworks - Ramsey Drive Asphalt overlay works Read more
Various Parks & Playgrounds 29/04/2019 24/05/2019 Public Toilet Refurbishment - Various locations Public toilet upgrades Read more
Trinity Beach Minor Road Works 29/04/2019 30/06/2019 Roadworks - Trinity Beach Rd, Trinity Beach Pavement rehabilitation works Read more
Kanimbla 02/05/2019 12/06/2019 McFarlane Drive – temporary road opening Road temporarily opened to all traffic from 2 May Read more
Kewarra Beach Minor Road Works 07/05/2019 31/05/2019 Roadworks - Albatross St Road pavement rehabilitation Read more
Babinda Drainage Works 02/05/2019 31/05/2019 Roadworks - Munro St, Babinda Culvert replacement works Read more
Cairns city 13/05/2019 21/06/2019 Cairns Esplanade erosion protection works Cairns Esplanade foreshore erosion works Read more
Manunda Minor Road Works 13/05/2019 07/06/2019 Roadworks - Birch Street Road pavement rehabilitation works Read more
Portsmith Minor Road Works 27/05/2019 21/06/2019 Roadworks - Buchan St Road pavement rehabilitation Read more
Cairns North Car Park Works 27/05/2019 18/07/2019 Car parking changes - Lake St CBD parking improvement works on Lake St, between McKenzie St and Grove St. Read more
Mooroobool Footpath & Cycleway Works 15/05/2019 30/06/2019 McCoombe Street pedestrian bridge A new pedestrian bridge is being installed. Read more
Various Drainage Works 13/05/2019 30/06/2019 Stormwater Relining Program Annual maintenance on stormwater systems will be undertaken at various locations Read more
Edge Hill Minor Road Works 27/05/2019 07/06/2019 Roadworks - Little Street Speed cushion replacements Read more
Woree Minor Road Works 10/05/2019 24/05/2019 Roadworks - Alberta Drive Speed cushion replacements Read more
Parramatta Park Minor Road Works 14/05/2019 31/05/2019 Roundabout works - Gatton St / Severin St Roundabout improvement works. Read more
Babinda 17/05/2019 31/05/2019 Tree removal – Munro St, Babinda Recommended removal of diseased fig tree Read more