Roadworks - Lennon St / English St / Tills St roundabout

  • Type of work: Drainage Works
  • Suburb: Manunda
  • Work period (anticipated): 07/09/2019 to 08/09/2019
  • Description: Stormwater pipe repairs
  • Likely impacts: Noise; Dust; Traffic Control; Road Closure
  • Location: Lennon St / English St / Tills St roundabout
  • Status: Closed
  • Contact: feedback@cairns.qld.gov.au

Cairns Regional Council wishes to advise that emergency stormwater repair works are programmed for Lennon St / English St / Tills St roundabout from SATURDAY 7 SEPTEMBER 2019.

This work involves the realignment and repair of a sunken stormwater pipe underneath the road, which is located on the eastern side of the roundabout between English St and Tills St.

To undertake this work will require:

  • Partial road closure from SATURDAY 7 SEPTEMBER under Stop / Go traffic control.
  • Full road closure from SUNDAY 8 SEPTEMBER on the eastern side of the roundabout between English St and Tills St.

During this time, please follow detours via Birch St / Bosanko St / Gatton St.

Traffic control will in place during the works program, with lane closures and delays expected. Please observe and obey traffic controllers and signs advising the changes to normal traffic conditions.

Council thanks you for your patience and cooperation during this time. If you have any concerns or would like further information, please email feedback@cairns.qld.gov.au

For download

Last updated: 08 September 2019